The Take-Home Submission Standard, Eight Gates to Send, Fix, or Send With Note
Grade any finished take-home against eight pass-or-fail gates from a clean copy and reach a Send, Fix, or Send With Note verdict in under 45 minutes.
Key takeaways
- Published estimates put a reviewer's first pass on a take-home at 4 to 20 minutes, so the package has to prove it works and explain itself inside that window.
- The one instant reject sources agree on is a project that does not run from a clean checkout following its own README, which is why every gate in this standard is graded on a fresh copy, never your working folder.
- In Jupyter, Run All does not restart the kernel, so the clean-run test for a notebook is Restart and Run All followed by a check that the headline numbers match the saved outputs.
- Employer briefs state budgets from 1-3 hours up to 5-8 hours, and reported completion rates fall from 75% at 1-2 hours to 20% at 7+ hours, so the defensible move is to stop at the budget and name what you cut.
- GitHub Free allows unlimited collaborators on private repositories, so a private repo with an invite costs nothing, but collaborators on a personal private repo get write access because there is no read-only role.
- The verdict is Send when all eight gates pass, Send With Note when only soft gates fail and each failure has a line in the cover note, and Fix when any hard gate fails.
This is a pass-or-fail standard for a finished take-home assignment, graded on the copy the reviewer will actually receive. It is for candidates holding a completed code repo, data notebook, design file, or written case deck who need a verdict before they press send. It gives eight gates, the rules for turning them into Send, Fix, or Send With Note, a timed procedure that runs in under 45 minutes, and the ways each check can pass when it shouldn't.
It covers the handover, not the solution. The assignment is done. What's left is to make sure the package gets through the reviewer's first pass instead of being dropped for something you could have fixed tonight.
What a reviewer does in the first 10 to 20 minutes
A reviewer's first pass is short and runs in a fixed order: open the package, read the README, try to run it, skim the structure, read one or two pieces closely, and form an opinion. Published estimates for that pass run from 4 to 20 minutes, depending on who is reporting.
| Source | Minutes | Source type |
|---|---|---|
| shouldapply | 4-7 | candidate blog |
| signalroster | 5-10 | vendor blog |
| Gergely Orosz | 5-20 | named hiring manager |
| sqaexperts / rankid | 10-20 | practitioner guides |
| interviewcost (vague rubric) | 45-75 | cost analysis |
The last row measures something different. It's the time a reviewer spends per submission when the rubric is vague, not the length of a first pass. I keep it in the table because it shows what ambiguity costs the person reading your work. No employer has published a rubric with measured timings, so treat these as reported ranges, not a benchmark.
The most useful line in the evidence comes from Orosz, writing as a hiring manager: "I spend 5-20 minutes on each one, spending less time on ones that work well and are clear." Read it closely. Clear work gets a shorter review. Unclear work doesn't get waved through. It gets a longer and more sceptical one.
The reviewer's reading order
- OpenClone the repo, open the notebook, or open the file link
- READMERead the goal, assumptions, and run steps
- RunFollow your instructions literally, in a clean environment
- SkimLook at structure, naming, and whether tests exist
- Read closelyPick one or two files, cells, frames, or slides
- DecideForm an opinion, often before reaching the end
PrepPilot describes the same pass from the other side: README, then the happy path, then judgement signals, then what you cut. Both versions put the README before the code and the run before the details. That's why this standard grades the run and the trace first.
Who is on the other side of the package
More than one kind of person may handle your package: someone who forwards it and someone who grades it. Refolk's index gives a sense of how many people hold the relevant titles.
| Title, country | Profiles in Refolk's index |
|---|---|
| Technical Recruiter, US | 21,150 |
| Technical Recruiter, UK | 704 |
| Engineering Manager, US | 43,105 |
Two limits apply here. First, the index counts people with a title. It doesn't show who reviews take-homes at any particular employer, and the "covering several teams" reading is my inference, not a measured routing fact. Second, the US count of Technical Recruiters is about 30 times the UK count. That ratio isn't a statement about market size. One unverified explanation is that UK recruiters often use other titles, such as "Recruitment Consultant". The practical point holds regardless: write the cover note so a non-grader can route it correctly without opening the code.
The eight gates of the take-home submission standard
The standard has eight gates, each pass or fail. Four are hard gates, where a failure stops the send. Four are soft gates, where a failure can be disclosed instead of fixed. Each gate states what passing proves and how it can look like a pass when it isn't.
Hard gates: a failure means Fix
| Gate | Pass when | What it proves | How it lies |
|---|---|---|---|
| G1 Clean run | Fresh copy runs from your README, twice, same output | It works without you | Hidden local state; stale outputs |
| G6 Rights and secrets | No keys, no employer data, terms checked | Nothing you can't hand over | Secrets in a gitignored file you later commit |
| G7 Access | Reviewer's link opens for the reviewer | They can see it | Invite sent to the wrong username |
| G8 Mechanics and note | Format, name, channel, timezone, note all match brief | It arrives intact and on time | Deadline read in your timezone |
G1 is the one gate every source treats as fatal. The instant reject they agree on is "a project that does not run from a clean checkout following your own README", and one source adds that "a non-running submission usually ends your candidacy." G1 therefore covers the run instructions too. If the README has no run steps, or they're wrong, G1 fails.
Soft gates: a failure can ship with a note
| Gate | Pass when | What it proves | How it lies |
|---|---|---|---|
| G2 Brief trace | Every requirement maps to a location; every ambiguity has an assumption | You answered the question asked | One silent reading of an ambiguous line |
| G3 Scope | Every feature traces to a brief line | You can prioritise | Extras that look like effort |
| G4 README or summary | Six sections present; summary stands alone | Your reasoning is visible | Sections present but empty |
| G5 Hours and cuts | Logged hours sit next to a named cut list | You managed the budget | Hours with no cuts reads as an excuse |
Test coverage sits inside G1 and G4 rather than getting its own gate. For code, "run" means the tests pass as well as the program. One source says the absence of tests "caps your score regardless of how clever the solution is." If tests were cut, they go on the G5 cut list.
The rubric categories in the public guides line up with these gates: does it run and meet the core requirements, is it readable and well structured, are there meaningful tests, are edge cases and errors handled, and does the README explain decisions and trade-offs. Third parties have published weights, such as 15% for tests and error handling plus 15% for README and cleanup, or 0-25 points each for run, functional tests, and README in one automated rubric. None of these weights comes from an employer. Use them to see that the README carries real weight, not to predict your score.
How the gates apply to notebooks, design files, and case decks
The eight gates work for any format, but the clean-run and README tests take a different form for each. A notebook's clean run is Restart and Run All. A design file's is opening the shared link as a viewer. A deck's is reading the executive summary alone.
| Format | Clean-run test (G1) | README equivalent (G4) | Access test (G7) |
|---|---|---|---|
| Code repo | Fresh clone, follow README, run twice | README with six sections | Invite pending or accepted |
| Data notebook | Restart kernel, run all, compare headline numbers | Top markdown cell with the six sections | Repo or file link opens |
| Design file | Open shared link in presentation mode | First screen states your role and the goal | Opens as viewer, not editor |
| Case deck | Exported file opens; summary read alone | One-page executive summary | File name and format match brief |
For case decks, put a one-page executive summary first. A PrepLounge thread suggests "7-10 content pages (meaning you exclude from count cover, agenda and divider pages) if you have 30 mins." Use that as a guide for length, not a rule, and if the brief states a length, the brief wins.
For design files, one design checklist asks, "Is my specific role stated in the first screen?" That line is the design version of a README goal section. Share the prototype "in presentation mode - not the editor", so the reviewer sees the work you chose to show and not your scratch layers.
I haven't found a published cross-format standard for take-home submissions. This table is my mapping of the code-review criteria onto the other three formats. If an employer's brief gives format-specific instructions, they override it.
How to reach a verdict: Send, Fix, or Send With Note
The verdict comes from the gates alone, so two people grading the same package against the same brief reach the same answer. Send means all eight gates pass. Fix means a hard gate failed. Send With Note means every hard gate passed and each failed soft gate is named in the cover note.
The rules, applied in order:
- Fix if any of G1, G6, G7, or G8 fails. Don't send.
- Fix if any of G2 to G5 fails and the cover note has no line naming that failure.
- Send With Note if G1, G6, G7, and G8 pass, at least one of G2 to G5 fails, and every failure has one line in the cover note saying what is missing and what you would do next.
- Send if all eight pass.
Verdict by gate type
If there's time to fix a soft failure instead of disclosing it, fix it. The grading doesn't distinguish between the two. Disclosure is acceptable because employers say they prefer it to the alternative: BetterUp says it would "rather see a smaller scope done well, honestly noted, than a sprawling half-finished build."
If a hard gate fails and you can't fix it before the deadline, tell the employer before the deadline passes. Orosz wrote: "I have never said 'no' to anyone who delayed their submission, assuming they communicated about this." That's one manager's practice, not a policy you can count on everywhere. Still, asking before the deadline costs you less than sending something that doesn't run.
Grade the package the reviewer receives, not the folder you built it in.
The pre-send procedure, step by step
The procedure takes about 43 minutes across seven steps, run in the reviewer's reading order: freeze a clean copy, run it, trace the brief, check the README, log hours and cuts, check rights and access, then mechanics and the cover note. Each step ends with a done condition, so you know when to move on.
Pre-send grading run
- Freeze and make a clean copyStop editing, then clone into a fresh directory, duplicate the design file, or export the deck. Done when the copy is made from exactly what will be sent. About 5 minutes.
- Clean-run the copy twiceFollow your own README exactly as written and run it twice; for notebooks, restart the kernel and run all cells. Done when it exits cleanly, tests pass, and both runs match. About 10 minutes.
- Trace every brief requirementMap each requirement to a file, cell, slide, or frame, and write an assumption for each ambiguous line. Done when nothing is unmapped. About 10 minutes.
- Check the README or summary sectionsConfirm goal, assumptions, how to run, included and cut, trade-offs, and next steps are present; a deck summary must stand alone. About 8 minutes.
- Log hours against budget and name cutsWrite logged hours next to the stated budget and list each cut with a reason. About 3 minutes.
- Check rights, secrets, and accessConfirm a private repo with an invite to the right username, or a viewer link, and no secrets or employer data in the package. About 3 minutes.
- Verify mechanics and write the cover noteMatch format, file name, and channel to the brief, convert the deadline to the employer's timezone, and write the note with the link and how-to-review steps. About 4 minutes.
The sources disagree on order. PrepPilot puts a 20-minute dry run after a 45-minute README block. DataEngineerAcademy says reviewers clone and run first, which argues for checking the run first. I put the run first because a failure there changes everything after it, and DataEngineerAcademy calls the clean-run itself a three-minute check. The per-step minutes are my own allocation, not taken from a source. Adjust them, but keep the total under 45 minutes. If the run takes longer than that, it will take the reviewer longer too.
How the standard goes wrong: failure modes and false positives
The most dangerous failures don't show up in your own environment. Your working directory holds state that a clean copy doesn't, so self-review passes things the reviewer will see break. Each failure below has a false pass and a specific check.
What travels with the package
- Cover noteLink, access method, deadline, how to review, known gaps
- AccessInvite, viewer link, file name, channel
- README or summaryGoal, assumptions, run steps, cuts, trade-offs
- ArtifactCode, cells, frames, slides as committed or exported
- Your machineEnv files, cached data, global packages, kernel state; none of it travels
1. Clean run passes in the working directory. It runs for you because of a gitignored .env file, cached data, or a globally installed package. The reviewer's clone has none of these. Check: fresh-clone on another machine or in a container and follow only the README. A second false pass hides here too. The first run succeeds, but the second silently doubles the output because the job isn't safe to re-run. Running twice and comparing the outputs catches it.
2. The notebook looks run but isn't runnable. Run All without a restart passes even when the cells only work in the order you happened to run them. Saved outputs make it worse: "The output cells still show the old numbers, so the notebook looks fine while being unrunnable." Check: restart and run all, then compare every headline number in your conclusions against the fresh output.
3. The brief trace passes on one silent interpretation. Every requirement maps somewhere, but an ambiguous line was resolved in your head and never written down. A reviewer guide says: "Strong candidates notice it and either ask or state an assumption in the README." Check: for each line in the brief that could be read two ways, there is a written assumption.
4. Extra scope passes as effort. Unrequested features feel like a bonus. One evaluation guide tells reviewers to "Ignore anything you did not ask for, including extra features and styling." At best, extras take up reading time. At worst, they look like you can't prioritise. Check: every feature in the main path traces to a line in the brief, and anything else goes in Next steps.
5. Access passes for you and fails for them. The private repo invite went to the wrong username or was never accepted, so the reviewer gets a 404. Opening the link yourself proves nothing, because you are the owner. Check: on the repo's collaborator settings, confirm the invite names the exact username the brief gave and shows as pending or accepted. For a public link, open it in a logged-out browser.
6. Hours pass without context. Writing "I spent 6 hours" with no cut list reads as an excuse. Going over budget with no note reads as poor judgement. Check: the logged hours line and the named cut list sit together.
7. A design file passes in the editor. You share editor access to a file full of working layers, and the reviewer lands in the mess. Check: open the shared link as a viewer and confirm it opens on the prototype in presentation mode.
8. A deck passes because the body is strong. The executive summary doesn't stand alone, or the body brings in data the summary never mentions. Check: read only the summary page and ask whether the recommendation and its main reason are clear.
One limit of the standard itself: all eight gates can pass on a solution that is simply wrong. The gates grade the handover, not whether the answer is correct. A package that passes every gate is one the reviewer can judge on its merits, which is what this standard is for.
How much time to spend, and how to report hours and cuts
Spend the budget the brief states, stop when you reach it, and report logged hours next to a named list of cuts. Employer briefs state budgets from about 1 hour up to 8, and the evidence suggests a project well over budget reads as worse judgement, not more dedication.
| Employer | Budget | Channel | Visibility |
|---|---|---|---|
| Welcome | 1-3 h | email link | private + collaborators |
| Litta | 3-4 h | repo | public, or private invite |
| BetterUp | 2-3 h | fork, 24h before deep-dive | fork |
| eBay Shutl (intern) | 3 h | fork + PR + email | fork |
| Unnamed brief | 5-8 h in 48h | FirstName_LastName.zip | fork or fresh repo |
Litta's brief is the plainest: "If you find yourself going past that, stop and submit what you have." The reason is comparison. "A reviewer comparing your submission against others sized to four hours will read a twenty-hour project as poor judgement rather than as dedication." Orosz adds that reviewers "don't look at - often do not even know - how long the person worked on it." Extra hours aren't visible to the reviewer. Extra scope is, and it gets read as a judgement call.
Completion data points the same way. One source reports completion rates falling from 75% at 1-2 hours to 20% at 7+ hours, though it doesn't publish its method. A cost analysis says "30 to 60 percent of assigned take-homes never come back." Both describe what candidates do, not how reviewers grade, so treat them as context, not as a target.
None of the employer briefs I found asks you to state your hours, so G5 is my recommendation, not an employer requirement. I include it because hours next to cuts turn a smaller scope into a decision you made instead of a gap. Here's a README skeleton that covers G1, G2, G4, and G5 in one file.
# <Project name> ## Goal What the brief asked for, in one sentence, in my words. ## How to run The commands I actually used, in order, from a fresh clone: 1. <command> 2. <command> Expected result: <what the reviewer should see> ## Requirement trace | Brief line | Where it lives | |---|---| | <requirement 1> | <file, cell, slide, or frame> | | <requirement 2> | <file, cell, slide, or frame> | ## Assumptions - <ambiguous line in the brief>: I assumed <X> because <reason>. ## Included and cut Included: <list> Cut: <item> - <why> - <what it would take> ## Trade-offs - <choice> over <alternative>, because <reason>. ## Hours Budget: <stated budget>. Logged: <hours>. Cuts are listed above. ## Next steps - <what I would do with more time, in priority order>
Keep the headings and replace each line with one to three sentences. For a deck or design file, put the same headings on the summary page or first frame.
Orosz says documentation "is such a miss on 80% of submissions I've seen." That's one manager's sample, but it suggests a complete README is the cheapest way to stand out on the whole list.
Private repos, rights, and the cover note
Use a private repo with an invite unless the brief asks for a fork or a public link. Check what you agreed to before sharing anything, and send a cover note that tells the reviewer exactly how to review the work. These three checks make up G6, G7, and G8.
Should the repo be private
The documentation settles this. GitHub Docs says: "If you're using GitHub Free, you can add unlimited collaborators on public and private repositories." Older tutorials that mention a three-collaborator cap are out of date. Employers accept private repos without fuss. Welcome asks for "a new private repository for your exercise" with its hiring team added as collaborators, and Litta allows a private invite instead of a public repo. The one cost is the write-access caveat covered in the failure modes. If the brief asks for a fork or a pull request, as BetterUp and eBay Shutl do, follow the brief.
Who owns the work
This isn't legal advice, and the sources aren't either. One secondary source says ownership "typically requires an explicit agreement, but always check what you agreed to when creating any assessment platform account." A copyright firm's position is that if the employer wants to use the work, "they should conclude a copyright transfer agreement or a license agreement with the author." The work-for-hire doctrine covers employees acting within the scope of their employment, which a candidate is not. For G6, the check is practical: read the brief and any platform terms you accepted, remove keys and credentials, and don't republish any employer data the brief gave you. Whether employers accept watermarks or scope-limit notes hasn't been established publicly, so I don't include them in the standard.
The cover note
Welcome asks for "a link to the repository and any special instructions", and one guide recommends "a clear 'how to review this' note." Nobody has published a recruiter-written template, and nobody has published guidance on stating the deadline's timezone. Both rules below are my own. They're there to cut the reviewer's time, since a vague rubric can stretch grading to 45 to 75 minutes per submission, and a how-to-review note does part of the rubric's job.
- State the deadline in the employer's timezone and your send time in the same timezone.
- If the brief sets a lead time, such as BetterUp's "at least 24 hours before your technical deep-dive", count back from that and not from the interview itself.
- Match the file name exactly when one is given, such as a zip "named exactly FirstName_LastName.zip".
Subject: <Role> take-home - <First name> <Last name> Hi <name>, My submission for the <role> take-home is here: <link> Access: <private repo, invite sent to <username> | public link | viewer link> Submitted commit or version: <tag, commit, or file version> Deadline: <date and time, employer's timezone>. Sent: <date and time, same timezone>. How to review this (about 10 minutes): 1. Read the top of the README: goal and assumptions. 2. Run: <single command, or Restart and Run All>. 3. The core of the work is in <file, notebook section, frame, or slide range>. Time: <logged hours> against a <budget> budget. Cuts are listed in the README. Known gaps: - <gate or requirement> - <what is missing> - <what I would do next> Happy to walk through any of it. <Name>
Send in the channel the brief names. Delete the Known gaps block if all eight gates passed.
If a resume or cover letter goes with the take-home, Refolk can tailor both to the posting from your own history. That keeps the take-home note short and focused on the work.
The pre-send checklist and keeping it current
Run this checklist on the clean copy just before you send. Each item is a statement you can mark true or false, and the timings add up to under 45 minutes.
Pre-send checklist (about 43 minutes)
- The copy I am grading was made from exactly what will be sent, not my working folder (5 min).
- A fresh clone, duplicate, or export runs by following my README literally, twice, with identical output (10 min).
- For a notebook, Restart and Run All completes and every headline number matches the fresh output.
- Every requirement in the brief maps to a named file, cell, slide, or frame (10 min).
- Every ambiguous line in the brief has a written assumption.
- Every feature in the main path traces to a brief line, and extras sit under Next steps.
- The README or summary has goal, assumptions, how to run, included and cut, trade-offs, and next steps (8 min).
- For a deck, the executive summary makes the recommendation clear when read alone.
- Logged hours sit next to the stated budget and a named cut list (3 min).
- The package contains no keys, credentials, or redistributed employer data (3 min).
- The invite names the exact username from the brief and shows as pending or accepted, or the viewer link opens in presentation mode.
- Format, file name, and channel match the brief, and the deadline is converted to the employer's timezone (4 min).
- The cover note has the link, access method, submitted version, and how-to-review steps.
- Every failed soft gate has one line in the cover note, or the verdict is Fix.
Keeping the standard current
Three inputs change over time, so re-check them instead of trusting a number you saved:
- Platform rules. Collaborator limits and role options are set by the hosting platform. Before relying on them, re-read the GitHub Docs page "Inviting collaborators to a personal repository".
- Budgets. Employers change their take-home scope without notice. Use the budget in the brief you were sent, never one reported by past candidates.
- Terms you accepted. Assessment platforms set their own terms. Re-read them for each new platform account.
After you send, keep the requirement trace. It's the same mapping from requirements to evidence that Refolk runs when it scores how well you fit a posting. If the trace showed a gap you couldn't close within budget, check your fit against the next role of that type before you commit another evening to a take-home.
Questions job seekers ask
What should I put in a take-home README?
Put six sections in it: goal, assumptions, how to run, what is included or cut, trade-offs, and next steps. Public templates agree closely on these. Litta's brief also asks for the run commands you actually used, in order, plus unfinished items. I add two more: a requirement trace table and an hours line next to the cut list. Orosz says documentation is a miss on 80% of the submissions he has seen, so a complete README is cheap differentiation.
How much time should I spend on a take-home assignment?
Spend the budget the brief states and stop there. Employer briefs I found range from 1-3 hours up to 5-8 hours of work inside a 48-hour window. Litta's brief says to stop and submit what you have once you go past its budget. Reviewers often do not know how long you worked, and a project far over budget can read as poor judgement, so log your hours and name your cuts rather than expanding scope.
Should I make my take-home repo private?
Yes, unless the brief asks for a public repo or a fork. Welcome asks for a private repo with its hiring team added as collaborators, and Litta accepts a private invite instead of a public repo. GitHub Free allows unlimited collaborators on private repos. One catch: personal private repos have no read-only role, so anyone you invite can write. Send the invite to the exact usernames given and confirm it shows as pending or accepted.
Why was my take-home rejected with no feedback?
The most common cause sources agree on is that it did not run from a clean checkout following your own README, which usually ends a candidacy on its own. Other likely causes are missing tests, which one source says caps your score, unrequested extra features, or a silent reading of an ambiguous requirement. Employers have not published their weights, so you can't know for sure. Run this standard on your next submission from a fresh copy to rule out those causes.
How do I submit a case study assignment for an interview?
Lead with a one-page executive summary that makes the recommendation clear when read alone, and keep the body from introducing data the summary does not mention. A PrepLounge thread suggests 7-10 content pages for a 30-minute slot, not counting cover, agenda, and divider pages. Export a clean copy, check the file name and format match the brief, and send a cover note that says where the recommendation is and how long the deck takes to read.
What if I cannot finish the take-home by the deadline?
Tell the employer before the deadline, not after. Gergely Orosz wrote that he has never said no to anyone who delayed their submission, assuming they communicated about it. If a hard gate fails, such as the project not running from a clean copy, ask for the time to fix it. If only soft gates fail, send on time with each gap named in the cover note.
Put this to work
Paste your career in once. Every application after that is written for you.
Drop a resume or a LinkedIn URL. I rank the live openings against it, rewrite the resume and write a cover letter for the best of them, and fill in the employer's form when you press the button. You read, you decide what goes out.
01Drop your resume
A PDF or a LinkedIn URL. About a minute, once.
02I rank the openings
Every weekday morning, the live catalog scored against your history. Up to 20 worth your time, not two hundred links.
03Each one is written up
Resume rewritten for the posting, a cover letter, a fit score. Press send, or let me fill in the form.
- New matches ranked and written before you are up.
- Every bullet stays inside what your history supports. Nothing invented.
- Queued, submitted, interviewing, offer: one screen, not a spreadsheet.
Free, no card. Up to 25 applications sent a week, and nothing is sent until you say so.