RefolkCandidates

Environmental Health & Safety Manager, Data Center Construction and Operations

Anthropic · Remote-Friendly, United States

Location
Remote-Friendly, United States
Workplace
Remote
Level
Manager
Posted
Today
Operations
Tailor my resume to this role

About a minute 500 free credits No card

  1. I read this posting
  2. Rewrite your resume against it
  3. Draft the cover letter, score the fit

Prefer Anthropic’s own form? Open the original posting

About this role

About Anthropic

Anthropic’s mission is to create reliable, interpretable, and steerable AI systems. We want AI to be safe and beneficial for our users and for society as a whole. Our team is a quickly growing group of committed researchers, engineers, policy experts, and business leaders working together to build beneficial AI systems.

About the role

Anthropic is hiring an EHS Manager, Data Center Construction and Operations to own environment, health, and safety across the full lifecycle of our data center sites - from construction and commissioning through to live operations. As we scale the physical infrastructure behind our research, this role makes sure the high-hazard work of building and running data centers is done safely, by our partners and for our people.

This is a specialized, field-facing, program-ownership role, and contractor safety is at the center of it. Most of the hands-on work at these sites is performed by general contractors, subcontractors, and specialty trades, so your impact comes through how well you set expectations, qualify and oversee those partners, and hold multi-employer worksites to our safety standards. You'll be Anthropic's safety presence on the ground - through active construction, the transition of commissioning, and the shift into operational EHS once a site is live.

You'll own these programs end to end today, and as our data center footprint grows you may build and lead a team to support them. You won't be doing this alone: you'll partner closely with the EHS Lead - who will help you stand up the vendor, consultant, and specialist support you'll rely on - and work with our construction, infrastructure, operations, Security, and Legal partners, as well as the contractor and operator organizations running the sites.

Responsibilities

Contractor safety is the core of this role. You'll build and run the programs that govern how contractors work on our sites - prequalification and selection, safety plan and method-statement review, site-specific orientation, high-hazard work permitting, and the audits and inspections that verify the work matches the plan. On multi-employer worksites you'll set clear expectations, coordinate across general contractors and subcontractors, and hold every party accountable for working safely.

You'll own EHS across the construction, commissioning, and operations phases. During construction that means the high-hazard exposures data centers involve - electrical and energized systems, working at height, heavy equipment, cranes and rigging, excavation, and fire and life safety - governed by OSHA construction (29 CFR 1926) requirements. Through commissioning you'll manage the safety of energization and testing, and as sites go live you'll transition programs to operational safety under general industry standards (29 CFR 1910), including electrical safety and NFPA 70E, lockout/tagout, and arc flash.

You'll investigate incidents, near misses, and injuries across your sites, drive them to root cause, and follow through on corrective actions - and you'll own EHS record keeping and reporting across the portfolio, including OSHA requirements and any contractor-injury tracking. You'll be the owner's safety representative in the room with construction and operations partners: reviewing readiness, walking sites, escalating when work isn't safe, and stopping it when it needs to stop.

You'll drive a consistent safety culture across geographically distributed sites and different partner organizations - building emergency preparedness, running or overseeing drills, and making sure lessons from one site reach the others. You'll select and manage the external support these programs depend on - third-party safety, industrial hygiene, and audit partners - with the EHS Lead's help in setting those relationships up, and you'll contribute to our site design and safety standards so new builds start from a safer baseline.

You may be a good fit if you

  • Have 8+ years of EHS experience, with significant time spent on construction, mission-critical, data center, or heavy industrial/operational projects

  • Bring deep, hands-on expertise in contractor and construction safety, including prequalification, safety plan review, high-hazard work permitting, and multi-employer worksite oversight

  • Have strong working knowledge of OSHA construction standards (29 CFR 1926) and general industry standards (29 CFR 1910), plus electrical safety and NFPA 70E, lockout/tagout, and fall protection

  • Are comfortable being the safety authority on an active worksite - making clear calls, holding contractors accountable, and stopping work when it isn't safe

  • Can build a program from the ground up and run it autonomously across multiple sites, prioritizing well when everything looks urgent

  • Are able to motivate and persuade contractors, operators, and cross-functional partners to engage with safety, not just meet the minimum

  • Are comfortable spending significant time in the field and traveling to sites, adapting quickly as projects move through construction, commissioning, and operations

  • Write clear, useful safety plans, playbooks, and program documents, and can create engaging training and presentations

  • Have hands-on experience with software tools for contractor management, incident reporting, risk assessment, and related functions

Strong candidates may also have

  • A Bachelor's degree in occupational health and safety, construction management, engineering, or a related field

  • Certifications such as CHST, CSP, ASP/GSP, or comparable US-recognized construction/safety credentials

  • Direct experience with data center, mission-critical, or large capital construction projects

  • Experience managing safety through commissioning and the handover into operations

  • Deep electrical safety expertise (NFPA 70E, arc flash, energized work)

  • Experience building a contractor safety program from scratch across distributed sites

  • Familiarity with ISO 45001 (Occupational Health and Safety Management Systems) and ISO 14001 (Environmental Management Systems)

  • Excellent computer skills - quick to pick up new applications and systems at the user and/or administrator level

The annual compensation range for this role is listed below.

For sales roles, the range provided is the role’s On Target Earnings ("OTE") range, meaning that the range includes both the sales commissions/sales bonuses target and annual base salary for the role.

Annual Salary:$320,000-$405,000 USD

Logistics

Minimum education: Bachelor’s degree or an equivalent combination of education, training, and/or experience

Required field of study: A field relevant to the role as demonstrated through coursework, training, or professional experience

Minimum years of experience: Years of experience required will correlate with the internal job level requirements for the position

Location-based hybrid policy: Currently, we expect all staff to be in one of our offices at least 25% of the time. However, some roles may require more time in our offices.

Visa sponsorship: We do sponsor visas! However, we aren't able to successfully sponsor visas for every role and every candidate. But if we make you an offer, we will make every reasonable effort to get you a visa, and we retain an immigration lawyer to help with this.

We encourage you to apply even if you do not believe you meet every single qualification. Not all strong candidates will meet every single qualification as listed. Research shows that people who identify as being from underrepresented groups are more prone to experiencing imposter syndrome and doubting the strength of their candidacy, so we urge you not to exclude yourself prematurely and to submit an application if you're interested in this work. We think AI systems like the ones we're building have enormous social and ethical implications. We think this makes representation even more important, and we strive to include a range of diverse perspectives on our team.

Your safety matters to us. To protect yourself from potential scams, remember that Anthropic recruiters only contact you from @anthropic.com email addresses. In some cases, we may partner with vetted recruiting agencies who will identify themselves as working on behalf of Anthropic. Be cautious of emails from other domains. Legitimate Anthropic recruiters will never ask for money, fees, or banking information before your first day. If you're ever unsure about a communication, don't click any links - visit anthropic.com/careers directly for confirmed position openings.

How we're different

We believe that the highest-impact AI research will be big science. At Anthropic we work as a single cohesive team on just a few large-scale research efforts. And we value impact - advancing our long-term goals of steerable, trustworthy AI - rather than work on smaller and more specific puzzles. We view AI research as an empirical science, which has as much in common with physics and biology as with traditional efforts in computer science. We're an extremely collaborative group, and we host frequent research discussions to ensure that we are pursuing the highest-impact work at any given time. As such, we greatly value communication skills.

The easiest way to understand our research directions is to read our recent research. This research continues many of the directions our team worked on prior to Anthropic, including: GPT-3, Circuit-Based Interpretability, Multimodal Neurons, Scaling Laws, AI & Compute, Concrete Problems in AI Safety, and Learning from Human Preferences.

Come work with us!

Anthropic is a public benefit corporation headquartered in San Francisco. We offer competitive compensation and benefits, optional equity donation matching, generous vacation and parental leave, flexible working hours, and a lovely office space in which to collaborate with colleagues. Guidance on Candidates' AI Usage: Learn about our policy for using AI in our application process.

As published by Anthropic. Applications are handled on their site.

About Anthropic

We're an AI research company that builds reliable, interpretable, and steerable AI systems. Our first product is Claude, an AI assistant for tasks at any scale. Our research interests span multiple areas including natural language, human feedback, scaling laws, reinforcement learning, code generation, and interpretability.

All 556 openings at Anthropic

One click, then it is written

Apply to Anthropic with a resume written for this role.

Queue Environmental Health & Safety Manager, Data Center Construction and Operations and I read the posting, rewrite your resume against it, draft the cover letter, and score the fit. Then you press send, or press one button and I fill in Anthropic’s form for you.

  1. 01Drop your resume

    A PDF or a LinkedIn URL. About a minute, once.

  2. 02I rank the openings

    Every weekday morning, the live catalog scored against your history. Up to 20 worth your time, not two hundred links.

  3. 03Each one is written up

    Resume rewritten for the posting, a cover letter, a fit score. Press send, or let me fill in the form.

  • 500 free credits
  • No card
  • Nothing sent until you say so

More roles at Anthropic

See all

Put this to work

Paste your career in once. Every application after that is written for you.

Drop a resume or a LinkedIn URL. I rank the live openings against it, rewrite the resume and write a cover letter for the best of them, and fill in the employer's form when you press the button. You read, you decide what goes out.

  1. 01Drop your resume

    A PDF or a LinkedIn URL. About a minute, once.

  2. 02I rank the openings

    Every weekday morning, the live catalog scored against your history. Up to 20 worth your time, not two hundred links.

  3. 03Each one is written up

    Resume rewritten for the posting, a cover letter, a fit score. Press send, or let me fill in the form.

  • New matches ranked and written before you are up.
  • Every bullet stays inside what your history supports. Nothing invented.
  • Queued, submitted, interviewing, offer: one screen, not a spreadsheet.

500 free credits on sign-up. No card. Nothing is sent until you say so.

Listed from the job board Anthropic publishes. Refolk is not the employer and does not handle their hiring. Applications go to Anthropic directly.